A fire outbreak has been reported early this morning (Monday) in a temporary building in the premises of Geometric Power, Nigeria’s foremost integrated power company, located in the Osisioma Industrial Layout, Aba, Abia State. The building was used by a defunct South African electricity firm known as Group 5 during the construction of facilities in the integrated power company and has been of little use in over 12 years. Confirming the incident, the management of Geometric Power said though the cause of the fire has yet to be determined, it…
Read More